100 km range in approx. 5 min charging time
320 kW in the power-limited grid
Flexible installation:
The conceptual separation of battery storage and charging station offers enormous flexibility in planning and installation. The ChargeBox Booster can be positioned up to 200 metres from the 400 V mains connection; a further 100 metres of cable distance is possible between the ChargeBox Booster and the ChargeBox Dispensers.
Expandable as required:
Two Dispensers can be operated on one ChargeBox Booster, providing 160 kW of power for ultra-fast charging of electric vehicles when used simultaneously. Our PowerBooster is suitable for all situations where more charging capacity is needed: Up to 4 fast charging stations can be connected and used simultaneously.
Easy to manage:
With Big-LinX Energy, our cloud-based energy management system, service and maintenance tasks can be carried out more efficiently via remote maintenance. Charging processes can be monitored more easily and even additional charging stations can be put into operation more quickly – perfect for service stations, vehicle fleets, logistics companies or public transport. Ultra-fast charging solutions from ADS-TEC Energy Ultra-fast charging without compromise ADS-TEC Energy’s ChargeBox fast charging solution draws its high electrical power from the specially developed battery storage system – the ChargeBox Booster.
The system is designed to be plugged into the ordinary grid power, where it initially charges slowly and at low power, just like a power bank. The stored energy is then delivered to electric vehicles on demand, ultra-fast and up to 320 kilowatts.
QUESTIONS & ANSWERS
Have a Question?
Be the first to ask a question about this.