EV Charger Installation for outdoor
EV Charger Installation for outdoor
Couldn't load pickup availability
Transform your property into a professional EV charging destination with a fully managed installation of Level 2 and Level 3 chargers. From site evaluation to final commissioning, we handle all aspects of design, construction, and compliance to ensure a safe, efficient, and future-ready system.
What’s Included
1. Site Assessment & Preparation
-
Comprehensive site survey to determine optimal charger, switchboard, and transformer locations
-
Coordination with the local utility for load analysis, transformer sizing, and metering approvals
2. Excavation & Conduit Installation
-
Code-compliant trenching (minimum 18 inches)
-
UL-listed conduit for power distribution to chargers
-
Extra conduit and bases for future charger expansion
3. Electrical Wiring & Connections
-
3-phase power wiring with grounding from switchboard to each charger
-
Dedicated breakers for each charging unit
-
Transformer feed connected to switchboard per UL and NEC standards
4. Circuit Breaker & Panel Setup
-
Main and branch breaker installation
-
All panels and circuits clearly labeled for service and maintenance
5. Charger Equipment Installation
-
Installation of Level 2 chargers for standard EV use
-
Installation of Level 3 fast chargers for rapid charging needs
-
Crane services for safe equipment placement with required clearances
6. Concrete Foundations
-
Reinforced, level pads for chargers and switchboards
-
Built to meet code and manufacturer specifications
7. Utility Transformer Installation
-
Utility-grade transformer installation and grounding
-
Full compliance with local utility requirements
8. Energy Metering & Communications
-
Real-time energy metering integrated into the switchboard
-
CAT5 cabling for charger diagnostics and centralized monitoring
9. Lighting & Security Systems
-
Overhead lighting for each charger space for safety and visibility
-
Security cameras with zoom capability to monitor charger use and site activity
10. Testing & Commissioning
-
Functional testing of all chargers
-
Verification of breakers, continuity, and metering accuracy
-
Resolution of any deficiencies before project closeout
11. Safety & Compliance
-
All work performed to UL and NEC standards
-
Safety measures including signage, protective bollards, and PPE protocols
12. Crane Coordination
-
Certified lifting services for charger delivery and placement
-
Safe rigging procedures followed at all times
13. Documentation & Project Closeout
-
As-built drawings
-
Equipment manuals and warranty documents
-
Inspection and testing reports